T2-61 : THRILLER PROJECT 2007/8

Wednesday 20 February 2008
T2-61 : THRILLER PROJECT 2007/8

7 The Review 8

  • We didn't deviate from our shot-list too much. We used some of the same closeups and the pictures Josh drew on the storyboard are similar to some of the shots we have made. We have used the storyboards outline the whole way throughout the introduction.
  • We had many issues during filming the scenes we seemed to resolve many of them rather easily though. We had a problem with the location we couldnty all get to the chosen area on the same days so we chose to use a closer location for filming. The second location we chose was still a forest like area with a 'creepy' look about it due to the hidden tree's and odd shapes in the tree's.
  • As we decided to do a lot of our filming in lesson time we made sure the whole of our group were with us at all times so we could get all parts of our filming done within each time slot we had.
  • many of rhe actors had a problem with our costumes as we would were different things each lesson after doing this once and having to change and delete half of the footage we did not make this mistake again. We just used footage when the audience could barely see what we wee wearing things, due to different angles.
  • If we could do things differently i would make sure we could all get to the same location at the same time as planned so we could get more filming done.

Labels:

0 Comments:

Post a Comment

<< Home